Western Harbour Tunnel: Night-Shift Hydro Demolition to Expose Steel for Tie-Ins

Nov 10
2 min read

On the Western Harbour Tunnel project in Sydney, Acciona engaged Water Jetting Solutions for handheld hydro demolition on its civil and surface works around Rozelle and the City West Link. Working night shifts on a live road corridor, our crew removed concrete to expose existing reinforcement and starter bars so new works could be tied back into them.

Night-shift hydro demolition at the Western Harbour Tunnel project, with the work area encapsulated and an exclusion zone set up

Project snapshot

  • Client: Acciona

  • Project: Western Harbour Tunnel – civil and surface works, Rozelle / City West Link, NSW

  • Dates: August to October 2026

  • Scope: Handheld hydro demolition to expose existing reinforcement and barrier starter bars for new works to tie into

  • Shifts: Night shifts on a live road corridor

  • Equipment: Hammelmann trailer pump, handheld UHP lances, encapsulation, vac trucks for water control

  • Crew: Two UHP operators

The scope

The work came in stages. The first package was a marked-out section of concrete at the City West Link, roughly 1.5 m long, 750 to 800 mm wide and 450 mm deep, removed to expose the existing steel for new intelligent transport systems (ITS) works. Acciona then brought us back to expose the starter bars at the footings of the concrete road barriers, so the new barriers could be tied into the existing reinforcement.

Why hydro demolition

The existing reinforcement had to be kept intact and reused, so breaking the concrete out with jackhammers wasn't an option. Ultra-high-pressure (UHP) water removes the concrete without vibration or impact, leaving the bars clean and undamaged and the concrete around them sound and rough for the new pour to bond to.

Reinforcement exposed by hydro demolition on the Western Harbour Tunnel project

Working on a live road at night

All the work was done on night shifts next to live traffic. Each shift, we enclosed the work area with encapsulation to contain water and debris, set up an exclusion zone around the UHP work, and ran vac trucks to capture the process water so nothing reached the road or drains. Before starting, our pumps, ute and compressor all went through Acciona's plant onboarding and inspection process, and our crew completed the project and site inductions.

The result

The existing reinforcement and barrier starter bars were exposed clean and undamaged, ready for the new works to tie into, with all of the work carried out on night shifts beside live traffic.

Need existing reinforcement exposed for new works to tie into? Contact us or call 0499 590 471.