Sydney Metro Rosehill Station: Hydro Demolition to Expose Couplers on Diaphragm Walls

Nov 10
2 min read

At Sydney Metro – Rosehill Station, Keller Intrafor JV engaged Water Jetting Solutions to carry out handheld hydro demolition on the station's diaphragm walls. Our crew removed concrete to prepare areas of the walls for patch repairs and to expose the cast-in couplers, without damaging the couplers or the reinforcement around them.

Couplers exposed in a diaphragm wall by handheld hydro demolition at Sydney Metro Rosehill Station

Project snapshot

  • Client: Keller Intrafor JV

  • Project: Sydney Metro – Rosehill Station, NSW

  • Dates: November 2025 to March 2026

  • Scope: Handheld hydro demolition for patch repairs and coupler exposure on diaphragm walls

  • Equipment: Hammelmann HDP200 trailer pump, handheld UHP lances, scissor lifts

  • Crew: Three-person crew

  • Safety: Completed with no safety incidents

The challenge

The couplers and reinforcing steel in the diaphragm walls had to come out clean and undamaged, ready for the next stage of the structure. The work also had to keep pace with a tight programme on a busy station site, alongside a number of other trades.

Why hydro demolition

Ultra-high-pressure (UHP) water removes concrete without hammering it, so there was no vibration transmitted into the walls and no damage to the couplers or reinforcement. It also leaves a clean, rough surface that new repair material bonds to well, which suited the patch repair areas.

How we did it

We ran a Hammelmann HDP200 trailer pump with handheld UHP lances, working from scissor lifts to reach the coupler bands and repair areas up the wall face. Because the pump operator couldn't see the lance operator from the pump location, we ran a three-person crew so there was always clear communication between the pump and the work face.

Handheld hydro demolition exposing couplers and reinforcement along a diaphragm wall at Rosehill Station

Working to the programme

With tight deadlines and other trades working around us, we planned each shift with the site team so our work areas, access and water run-off didn't hold anyone else up, and the job kept flowing.

The result

The work was completed to programme with no safety issues. Keller Intrafor JV were extremely happy with the result, and the job led directly to our next Sydney Metro package at Parramatta Station.

Need couplers or reinforcement exposed without damage? Contact us or call 0499 590 471 to talk through your project.