Sydney Metro Rosehill Station: Hydro Demolition to Expose Couplers on Diaphragm Walls
At Sydney Metro – Rosehill Station, Keller Intrafor JV engaged Water Jetting Solutions to carry out handheld hydro demolition on the station's diaphragm walls. Our crew removed concrete to prepare areas of the walls for patch repairs and to expose the cast-in couplers, without damaging the couplers or the reinforcement around them.

Project snapshot
Client: Keller Intrafor JV
Project: Sydney Metro – Rosehill Station, NSW
Dates: November 2025 to March 2026
Scope: Handheld hydro demolition for patch repairs and coupler exposure on diaphragm walls
Equipment: Hammelmann HDP200 trailer pump, handheld UHP lances, scissor lifts
Crew: Three-person crew
Safety: Completed with no safety incidents
The challenge
The couplers and reinforcing steel in the diaphragm walls had to come out clean and undamaged, ready for the next stage of the structure. The work also had to keep pace with a tight programme on a busy station site, alongside a number of other trades.
Why hydro demolition
Ultra-high-pressure (UHP) water removes concrete without hammering it, so there was no vibration transmitted into the walls and no damage to the couplers or reinforcement. It also leaves a clean, rough surface that new repair material bonds to well, which suited the patch repair areas.
How we did it
We ran a Hammelmann HDP200 trailer pump with handheld UHP lances, working from scissor lifts to reach the coupler bands and repair areas up the wall face. Because the pump operator couldn't see the lance operator from the pump location, we ran a three-person crew so there was always clear communication between the pump and the work face.

Working to the programme
With tight deadlines and other trades working around us, we planned each shift with the site team so our work areas, access and water run-off didn't hold anyone else up, and the job kept flowing.
The result
The work was completed to programme with no safety issues. Keller Intrafor JV were extremely happy with the result, and the job led directly to our next Sydney Metro package at Parramatta Station.
Need couplers or reinforcement exposed without damage? Contact us or call 0499 590 471 to talk through your project.